PROJECTS

Lee Tunnel

FACTSHEET

Location

Beckton, London

Sector

Industrial & Energy

Date

2015-2016

The Lee Tunnel is a 4-mile long overflow sewer in East London, capturing an average of tively capture an average of 16 million tonnes of sewage a year from the 35 most polluting combined sewer overflows built by the Victorians.

Fastglobe were privileged to be contracted to work on this legacy contract. We completed two-part sealant to external retaining walls and to the pumping shaft roof areas. Fire-rate sealant was also supplied and installed to the 80 metre deep shaft. Our specialist operatives received confined space training working in these conditions.

Talk to us

To get a quote or to make an enquiry, send us a message using the form below, and we’ll get back to you as soon as possible. Select ‘Choose Files’ should you want to send us photos/files with your message.

No file chosenAccepted file types: jpg, jpeg, jpe, png, bmp, webp, pdf. Max. file size: 10 MB

11 + 3 =